By the Editorial Staff of Bonfiglioli Consulting
Every publication stems from industry studies, field research, and global trend analysis, integrated with the knowledge and expertise gained from transformation projects, with the aim of promoting a business culture.
Published 06/15/2026

Because VSM is a decisive tool for improving business processes?

In many companies, the actual lead time is 10 to 20 times longer than the actual processing time. Yet this gap remains invisible until it's measured with a specific tool. Value Stream Mapping It's exactly for this: to show where the unseen time goes, to separate activities that create value from those that consume it, and transform that photograph into a concrete action plan.

Why VSM Really Matters

Many companies have processes that seem to work but actually hide delays, inventory, and rework that are difficult to read without a structured tool. The VSM Bring these critical points to light because places materials, information, and process data on the same level, offering a shared and standardized vision of the flow. Therefore, it is not used to design the process, but to understand it better in order to decide where to intervene.

Its strength also lies in Connect the current AS-IS state with the future TO-BE state. This passage highlights the gap between what happens today and what the process could become, helping to define priorities, responsibilities, and improvement goals based on observations, not perceptions.

What is Value Stream Mapping

Value Stream Mapping is a visual representation of the flow of value within an organization, built with standard symbols and indicators useful for measuring process performance. Its objective is not to describe a department or a layout, but Show how value flows through the system from the customer's perspective. For this, consider both operational activities and the information that guides the work.

VSM is a tool capable of revealing waste and areas for improvement, as well as supporting the definition of a Future State and an Action Plan. This is its true usefulness: It doesn't just photograph the present, but helps to design the future and build the path to achieve it.

Why does it work

VSM works because it forces the team to view the process as a single system. An optimized flow doesn't just depend on the efficiency of one phase, but on the consistency between all activities and their ability to respond to customer demand. It's not enough for one station to work quickly if the material then sits idle elsewhere: the bottleneck shifts, but the Lead Time remains high.

Workload balancing is one of the natural outcomes of VSM, along with the ability to identify warehouses, buffers, and supermarkets, which are points where the flow is pushed instead of pulled. This difference is decisive: many inefficiencies arise not from a lack of attention, but from a system designed without an overall vision of the flow.

Data to collect

To build a reliable VSM, you need process data and organizational data. Among the fundamental elements are Takt Time, Lead Time, process time, cycle time, uptime, setup, non-conformity, and the work content of the phase. Without these numbers, the map risks remaining an elegant representation without decision-making value.

Collecting this data directly in the field, by observing the process in its real conditions, is an essential part of the methodology.. It is this empirical approach that distinguishes VSM from simple process mapping: you don't draw how you think the flow works, but how it actually works.

Material and informational flow

One of the main strengths of VSM is its ability to bring together two flows that in many companies are managed separately: the flow of materials and the flow of information. The first shows how parts or services move through the process; the second shows how orders, instructions, and priorities move through the organization. If either of these is misaligned, the system loses efficiency even when individual activities are well executed.

In complex or multi-phase processes, the problem is rarely a single point, but rather the interaction between points. VSM makes these dependencies visible and allows them to be addressed based on a shared understanding, not subjective interpretations. This is the step that transforms mapping from a technical analysis into a management tool.

As-is and to-be

The distinction between AS-IS and TO-BE is one of the reasons why VSM is effective in improvement projects. The AS-IS documents what happens today: steps, timings, queues, inventories, information flows, and decision points. The TO-BE defines the ideal flow and the necessary changes to get closer to it, taking into account priorities, technical feasibility, and impact on KPIs.

This transition requires the definition of key elements, identification of critical issues, and the construction of an action plan with responsibilities and deadlines. And it is precisely here that the map ceases to be an analysis exercise and becomes a concrete tool for process governance.

Takt Time and Lead Time

Understanding the difference between Takt Time and Lead Time is essential for correctly reading a VSM. Takt Time represents the rhythm required by the market, i.e., the pace at which the process should produce to meet customer demand. Lead Time, on the other hand, measures the total time it takes for a unit of product to go through the entire flow, from beginning to end.

When the Lead Time is much higher than the useful processing time, a large part of the time is absorbed by waiting, accumulation, transfers, and coordination inefficiencies. In a manufacturing company with an actual processing cycle of a few hours, it is not uncommon for the total Lead Time to exceed 10-15 days: VSM is the tool that makes this gap visible and indicates where to intervene to reduce it.

Cycle time and balancing

Cycle time tells the cadence at which a single step generates output, while process time indicates the duration required to complete that step. The VSM becomes powerful when it compares these numbers with the Takt Time and shows where the process is overloaded, where it is underutilized, and where it can be rebalanced to better respond to demand.

Phase balancing is a natural goal of mapping: it's not just about eliminating waste, but about redistributing the load so that the flow runs without accumulation and bottlenecks. It is one of the most effective levers for improving Lead Time without necessarily increasing resources.

Where does waste originate

VSM makes visible the waste that those who live the process every day often fail to see. The distinction between value-added activities, necessary non-value-added activities, and non-value-added activities allows for the separation of what is truly needed from what can be eliminated or simplified, with an objective and shared criterion.

From a managerial perspective, not all waste can be eliminated immediately, but almost all of it can be classified, measured, and addressed with a priority order based on cost, benefits, and technical feasibility. This is where VSM becomes a lever for better decision-making, not just for observing the problem.

How to build well

A well-made VSM is born from teamwork, not individual analysis. The use of sticky notes, standard symbols, and a shared construction of the AS-IS process makes the work collaborative, verifiable, and easily shareable across different functions. This reduces the risk of arbitrary interpretations and increases alignment between those who govern the process and those who execute it.

Those who apply VSM gain the ability to map the business value stream, identify bottlenecks, and prioritize areas for intervention with objective criteria.

Who is it useful for?

VSM is suitable for production managers, operations managers, continuous improvement managers, Lean specialists, department heads, shift leaders, supervisors, team leaders, quality managers, and process technicians. It's a cross-functional tool, effective for both those who govern the process and those who manage its operational details.

This transversality is a concrete advantage, because many process problems arise in the handoffs between different functions. VSM helps to build a common language and to shift the discussion from perceptions to observed data in the field.

A concrete example

In a manufacturing company with an actual production cycle of just a few hours, VSM revealed a total lead time of 12 days. 90% of that time was consumed by waiting between stages, improperly sized intermediate inventory, and information misalignments between the production department and planning. The problem was not the speed of the individual stations, but the lack of flow between them.

This is exactly the type of situation where VSM becomes decisive for management: It not only indicates where time is lost, but also with what priority to intervene. and which KPIs to measure to verify improvement.

Deep dive into VSM

If you want to map your process flow and build a concrete improvement plan, discover the VSM course at Lean Factory School: 8 hours in person, operational method, measurable results. Turn the map into action.

Bonfiglioli Consulting          Copyright © 2026 Bonfiglioli Consulting.  All rights reserved.  P.I. 02646871208          Privacy Policy  |  Cookie Policy  |  Adjust Preferences