What is it?
A method for enabling rapid changeovers. Typically reducing the changeover time to less than 10 minutes. The SMED steps include:
Internal tasks must be done when the machine is stopped, while external tasks are done while the process is running.
How can I help?
This allows for smaller batch production of processes such as plastic molding, metal stamping, etc., thereby reducing inventory and processing time, as well as improving customer responsiveness.